Engineering risk assessment and engineering reports for the effective design and placement of insurance programmes.
Six steps from the first site visit to an estimate of the maximum loss.
Site visits
Visiting the site to identify key hazards and assess existing risk responses.
Interviews
Conducting interviews with key personnel and managers.
Operational analysis
Analysing key operational activities, operational risks and existing risk response measures.
Recommendations
Preparing recommendations to minimise operational risks.
Loss scenarios
Modelling possible loss scenarios.
PML & EML
Estimating the probable maximum loss (PML) and estimated maximum loss (EML).
We prepare the engineering reports required for the effective design and placement of insurance programmes, including:
- 01
Property damage & machinery breakdown
Investigation of risks of property damage and breakdown of machinery and equipment.
- 02
Business interruption
Investigation of risks associated with business interruption.
- 03
Construction & installation
Investigation of risks associated with construction and installation work.
From a single site to a full portfolio — talk to our risk management team in Muscat.